Project: Culvert Replacement Location: Ashland Rd between Larned Rd & Tulip St, Summit Date: On Or About June 30, 2008 Duration: 4 Months Project Manager: Walter Patrylo, Union County Engineering. (908) 789-3690 Contractor: Caro Corporation, (973) 635-7141 |
||||
|
||||
|
||||
NOTICE OF ROAD CLOSURE Please be advised that Ashland Rd from Larned Rd. to Tulip St. in Summit will be closed on or about the date referenced above. The work being performed will consist of replacing the culvert over Salt Brook. Due to the nature of the work full road closure will be necessary in the area of work to optimize the safety of the work crews and motoring public alike. A clearly marked detour route will be established and maintained by the contractor. Emergency vehicles will not be allowed through the work zone. Access to residences, including deliveries and other services, living within the road closure up to the work zone will be allowed at all times. The County recognizes the inconvenience that any road construction may cause and apologizes for any difficulties encountered. We thank you for your cooperation and shall make every effort to have the work completed as soon as possible. Regular updates for the various phases of construction and their impact on traffic can be found right here. Bookmark this page to stay informed. |
||||
![]() |
||||
|
||||